Usage |
 |
Supplementary Cementitious Material
|
Limitations |
 |
At temperatures above 23°C, concrete containing CemPlus has moderately longer time of set compared to concrete containing 100% Portland cement which is advantageous during the peak construction season. At placement temperatures between 0°C and 13°C, setting times can be considerably longer when compared to 100% Portland cement concrete and standard cold-weather practices should be followed.
|
Exceeds |
 |
St Marys CemPlusŪ conforms to CSA A3001 and OPSS 1350.
|
|
|
|